Consistent units
Convert feet and inches before metric entry. Keep the original measurement visible.
Plan renovation quantities and material purchases with explicit metric inputs, editable CAD examples and location-specific quote assumptions.
Metric quantities · Editable rates · Purchase planning · Print-ready reports
EDITORIAL IMAGE · CONSTRUCTION IN CANADA10 m × 8 m × 0.15 m + 5%
Convert feet and inches before metric entry. Keep the original measurement visible.
Separate retained areas, removal, preparation and finishes.
Check freight, unloading and handling alongside the unit rate.
Three metric demos for concrete, blocks and tiles. CAD rates are illustrative.
Adjust the dimensions, allowance and example rate. Review the formula behind the result.
This demo runs in your browser. Inputs are not saved or automatically transferred into a TB project.
Show how a dimension became a quantity, how an allowance changed the purchase and what the price includes.
List each room, element and work item.
Convert dimensions explicitly before calculating.
Check coverage, allowances and full packages.
Confirm freight, unloading and quote inclusions.
Check renovation drawings, site notes and supplier units when feet, inches and metric dimensions meet.
Read the guideSeparate retained surfaces, removal, preparation and purchased finish quantities.
Read the guideCompare product units, freight and site handling before treating supply prices as equivalent.
Read the guideA personal workspace for your estimating work.
A connected workflow for an estimating team.
More capacity for a larger operation.
Subscription prices are stated in USD on the main TB platform. Review current prices, capacity, billing period, automatic renewal terms and the final checkout total before subscribing. CAD figures here are illustrative construction-material examples.
Inputs are metric, without a unit selector. One foot equals exactly 0.3048 m; one inch equals exactly 0.0254 m. Convert every relevant dimension before calculating area or volume.
No. They are illustrative inputs. Obtain a quotation for the actual product, quantity, destination, date and scope.
No. Removal, protection, walls, openings, preparation and making good can each have a different quantity and unit. Measure the actual work.
A uniform rectangular slab quantity plus an editable allowance and material subtotal only. Foundations, reinforcement, formwork, labour, pumping and freight require separate review.
Explore construction quantities, purchasing, editable costs and resource planning in TrendyBuilders. Find a plan for your own work or your team.