Give every quotation a destination and a scope.
Compare product units, freight and site handling before treating supply prices as equivalent.
Name the delivery basis
A rate is easier to assess when its destination, date and service scope are recorded beside it. Specify collection, delivery to a named location or another agreed arrangement. Do not assume a quotation remains valid for another address.
Give suppliers common information
Use the same specification, quantity, commercial unit and requested timing. Include relevant access and unloading details. Record validity and outstanding confirmations without inventing availability or freight charges.
Check the block example
The demonstration wall has 10 × 3 = 30 m² gross area. Deducting 4 m² of openings leaves 26 m². Dividing by a nominal 0.4 × 0.2 m block face gives 325 blocks. With 5% allowance and rounding up, the quantity becomes 342.
At illustrative CAD3.50 each, the block-unit subtotal is CAD1,197. Mortar, grout, reinforcement, lintels, finishes, labour, freight and tax are separate. Confirm actual dimensions and commercial packs; this arithmetic does not select a wall system.
Review the last stage to the work
- Who provides unloading equipment and labour?
- Where can the delivery vehicle stop?
- What handling remains from drop-off to installation?
- How much material can the site store?
- Would staged delivery change the package?
Keep unknowns visible
List material subtotal, known delivery charges and included services separately. State whether tax is included or excluded without assuming its treatment. Reconfirm when destination, product, quantity or timing changes.
TB supports calculation and purchasing plans. It does not price a transport route, reserve stock or arrange delivery. Confirm the actual commercial agreement directly with the supplier.